Tuesday, June 21, 2011
Find the sequence that will minimize total completion time.
Seven jobs are to be processed on two machines; each job must follow the same sequence beginning with machine A and moving to machine B. The processing time in hours is as follows:
Job 1 2 3 4 5 6 7
Machine A 10 12 13 7 14 5 16
Machine B 15 11 8 9 6 7 16
i) Find the sequence that will minimize total completion time.
ii) Construct a chart of the resulting sequence and find machine B’s idle time.
Uploaded with
ImageShack.us
Tags :
Completion time
0 comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Search This Blog
Popular Posts
Five major types of materials handling methods
Describe five major types of materials handling methods and name some advantages of each. Five Major Types Of Materials Handling Methods: Mo...
Prepare a REL chart for the different departments of a typical hospital.
How can the relationships of different departments be considered in preparing a layout? Prepare a REL chart for the different departments of...
“You don’t inspect quality into a product: You have to build it in.” Discuss the implications of this statement.
“You don’t inspect quality into a product: You have to build it in.” Discuss the implications of this statement. Answer. The saying, ...
Explain different types of maintenance giving suitable example. Suggest an organisation structure for the maintenance department of a medium- sized company.
Explain different types of maintenance giving suitable example. Suggest an organisation structure for the maintenance department of a medium...
hat do you understand by Automated Storage and Retrieval? For what kinds of goods and in which companies in India do you think such systems would be appropriate?
What do you understand by Automated Storage and Retrieval? For what kinds of goods and in which companies in India do you think such system...
What do you mean by an integral approach to Materials Management? Explain.
What do you mean by an integral approach to Materials Management? Explain. Answer. Materials management is a coordination function respons...
Determine each alternative’s break-even point in unit
A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two, alternatives, A and B have been identi...
Calculate the following: i) Standard time per piece of a job whose normal time is 5 minutes. ii) Number of pieces to be produced per day. iii) Efficiency of worker, for 190 jobs, he produced in a shift.
A worker in a manufacturing industry is expected to work for a minimum of 400 minutes, in an 8-hour shift. The remaining 80 minutes is meant...
If 850 pallet loads must be moved during each 8- hour shift, how many lift trucks are required?
Northwest product company uses forklift trucks to transport lumber from the mill to a storage warehouse 0.5 km away. The lift trucks can mov...
Prepare a short working paper outlining your suggestions to improve the systems operations.
Consider the following situation: You have been asked to look into the operations of a company, which is in business of repairing and overha...
My Other Sites/Blogs
Mobile Jokes
Tags
aggregate planning
(1)
automated storage and retrieval
(2)
Break even point
(1)
capacity planning
(1)
Carrying Cost
(1)
Completion time
(1)
Critical Path
(1)
Effective capacity
(1)
Efficiency
(1)
Evaluating Criteria
(1)
FMS
(2)
Home Computers
(1)
incentive plans
(1)
Inspection Cost
(1)
Job design
(2)
Locations decisions
(1)
Maintenance
(1)
Material handling
(1)
Material Management
(1)
Multi disciplinary Function
(1)
Numericals
(4)
Operations Management
(1)
Operations Managers
(1)
preventive maintenance
(1)
Production Run
(1)
project network
(1)
Quality
(2)
REL chart
(1)
Reorder Level
(1)
scheduling of activities
(1)
Site Selection
(1)
Supplier Selection
(1)
work design
(1)
working paper
(1)
About Me
Satish
View my complete profile
Followers
updated upto julydecd2006
Satish: 21/6/2011