Northwest product company uses forklift trucks to transport lumber from the mill to a storage warehouse 0.5 km away. The lift trucks can move three loaded pallets per trip and travel at an average speed of 8 km per hour (allowing for loading, delays and travel). If 850 pallet loads must be moved during each 8- hour shift, how many lift trucks are required?
Solution.
Time taken by truck to move to storage = (60 minutes/8) x 0.5 = 3.75 minutes
Number of pallets moved in a truck per day =
8*60*3 / 3.75 = 384
Number of trucks required = 850/384 = 2.21
Three lift trucks are required.
Tuesday, June 21, 2011
If 850 pallet loads must be moved during each 8- hour shift, how many lift trucks are required?
Posted by
Unknown
at
2:23 AM
Tags :
Numericals
1 comments:
- gman said...
-
I believe the answer is 4.427 rounded up to 5 trucks.
The distance to warehouse is 0.5km but the travel distance to make a back and forth trip is 1km. So 8 trips per hour, 64 trips a day, 192 pallets moved a day per truck.
Please confirm if I'm understanding the problem correctly and if you can recheck and repost correct answer. - October 14, 2011 at 6:23 PM
Subscribe to:
Post Comments (Atom)
Search This Blog
Popular Posts
-
“You don’t inspect quality into a product: You have to build it in.” Discuss the implications of this statement. Answer. The saying, "...
-
A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two, alternatives, A and B have been identi...
-
Describe five major types of materials handling methods and name some advantages of each. Five Major Types Of Materials Handling Methods: Mo...
-
How can the relationships of different departments be considered in preparing a layout? Prepare a REL chart for the different departments of...
-
Explain different types of maintenance giving suitable example. Suggest an organisation structure for the maintenance department of a medium...
-
What are the factors considered to decide the effective capacity of a plant? Give some examples. Answer. Capacity planning is the process o...
-
What is work design? What are its constituents? Explain using a schematic diagram. What is job design? What are the behavioral aspects in jo...
-
Discuss the role of the operations manager in today’s context. Do you agree that operations management is a multi-disciplinary function? Dis...
-
A contractor has to supply 10,000 bearings per day to an automobile manufacturer. When he started production runs, he can produce 25,000 bea...
-
A worker in a manufacturing industry is expected to work for a minimum of 400 minutes, in an 8-hour shift. The remaining 80 minutes is meant...